Bedlington to Blyth Cycle Path

Reconstruction works made to a section of cycle path, between Bedlington and Blyth, Northumberland.

We installed a new 100m section of cycle path, this was to replace an existing path which had been damaged due to landslip.

Initially we installed a post and 5 rail fence to the site boundary. Then we stripped off the proposed route, spreading the arisings on the old footpath which was then seeded. Followed by a full highway construction to the new section of cycle path.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
"Developing the Environment"
  • Facebook Social Icon
  • Twitter Social Icon

•     WL Straughan & Son Ltd    •    Lane Farm, Bedlington, Northumberland, NE22 6AA    •     (T) 01670 823042     •  

© WL STRAUGHAN & SON LTD